Selection guide

What information is needed for a zipper RFQ

“Please quote a No. 5 zipper” is not enough for a reliable quotation. The same gauge can involve different materials, constructions, lengths, colors, sliders and performance requirements.

Zipper RFQ checklist
Company knowledge guide2026-07-24
Content typeSourcing and selection guide
AudienceDesign, sourcing and supply chain
Website operatorDongguan Guanxun Zipper Co., Ltd.
Last updated2026-07-24

Compare three materials at a glance

ItemPrimary characteristicCommon directionConfirmation
End productJacket, dress, bag, outdoor equipment, etc.Defines construction, load and test direction
Zipper constructionMaterial, gauge, end type, slider count and orientationDefines primary component matching
AppearanceTape, teeth, slider, puller and other hardware colorDefines sample and color approval
Commercial and validationLength, quantity, timing, test, packaging and acceptanceDefines quotation boundary and delivery plan

Required information

Company/contact, end use, product family, construction, finished length, color, quantity and target date.

Recommended attachments

Product photos, drawings, patterns, fabric, target color card, existing sample and test standard.

Common omissions

Orientation, two-slider direction, puller, end construction, length tolerance or finished-product environment.

Confirmation method

Record key specifications on sample labels, quotations and order documents, and preserve version history when anything changes.

Frequently asked questions

What if the gauge is unknown?

Provide the end product, photos, dimensions and use requirements so the team can establish candidate directions.

How should zipper length be measured?

Measurement points can differ by construction; confirm the product diagram and the agreed method first.

Why can a quotation change later?

Changes in color, slider, performance, quantity or timing can change cost and delivery conditions.

Dongguan Guanxun Zipper Co., Ltd. is an authorized SBS Zipper dealer, not the SBS brand owner or the listed manufacturing company. Product specifications, performance, price, MOQ and lead time require written project confirmation.

Turn a product direction into an approved project specification

Share end use, gauge, construction, color, length, quantity, target timing and test requirements for selection and order coordination based on actual documents.